Risk
State the hazard, required duty and applicable site rules.
Determines whether the barrier family fits.
Temporary excavation-edge barrier family
A modular yellow construction barrier family using mesh, perforated or vertical-bar panels with lower kick plates, posts and bases for project-defined excavation and restricted-zone edges.
Provide the excavation geometry, edge distance, required barrier duty, ground or slab interface, access, visibility and applicable temporary-works requirements.
The page collects the variables that change suitability, scope and price. It does not replace the approved drawing, quotation or responsible engineering review.
State the hazard, required duty and applicable site rules.
Determines whether the barrier family fits.Provide pit shape, levels, edge condition and available setback.
Controls layout and stability.Choose mesh, perforated or bar form and lower kick plate.
Balances visibility and debris control.Schedule personnel, material and emergency openings.
Keeps gates and removable bays in scope.Describe slab, soil, anchors and movement restrictions.
Defines posts and bases.Identify pedestrians, equipment and vehicle exposure.
May require additional protection.Values shown here describe the supply variables. Exact dimensions, finishes and components are confirmed for the project.
Send the missing inputs →| Field | Current supply basis | What to confirm |
|---|---|---|
| Panel form | Mesh, perforated or vertical-bar family | Confirm opening and visibility. |
| Frame | Yellow coated steel module | Confirm dimensions and sections. |
| Kick plate | Black or striped lower solid panel by option | Confirm height and debris duty. |
| Posts | Matching posts and bases | Provide floor and edge conditions. |
| Access | Gate or removable module by scope | Provide clear openings. |
| Finish | Safety colour coating | Approve colour and exposure. |
| Final basis | Approved risk basis, layout and quotation | No fall rating is implied. |
The sequence keeps product selection, engineering responsibility and commercial scope aligned.
State what the system must separate, screen, protect or control and provide the applicable project criteria.
Provide dimensions, levels, corners, openings, supports and every site interface.
Approve materials, finish, connections, accessories and the engineering or installation responsibility boundary.
Confirm drawings, quantities, packing, destination, documentation and required delivery date.
Each image explains a form, interface or possible application. Captions state where a drawing, sample or project review is still required.



These answers define the quotation boundary without inventing project-specific performance.
No such result is implied. State the required duty, standard, loading and verification basis.
That depends on ground, excavation, loads, setback and responsible temporary-works design.
They can be reviewed when clear widths, travel, hardware and operating controls are defined.
No. It is a representative illustration, not installation or compliance evidence.
Complete the project brief
Confirm duty, layout, public interface, ground, exposure, support, gates, duration, inspection, packing and the responsible approval boundary.
Complete the known fields. If drawings or standards apply, mention them in project notes and attach them when your email application opens.
Submitting this local form opens your email application. It does not transmit data to the website.