FACTORY-DIRECT WIRE MESH & FENCINGCustom sizes · Export packaging · Project support
Products / Temporary Fencing & Hoarding / Corrugated Steel Site Hoarding

Opaque temporary perimeter screen

Corrugated Steel Site Hoarding

A corrugated steel temporary hoarding family coordinated as opaque panels, galvanized posts, feet or anchors, rear braces, access openings and project-defined wind and ground interfaces.

Confirm the site perimeter, required height, wind exposure, ground or slab condition, brace space, gates, finish and local temporary-works requirements.

Panel
Corrugated steel sheet
Support
Posts, feet and rear braces
Duty
Temporary opaque site screening
Final basis
Approved layout and quotation

Where this product family fits.

  • Temporary construction and works perimeters needing opaque screening and managed access.
  • Projects able to define wind, ground, bracing space, height and gate openings.
  • Panel, post and brace packages released from an approved temporary layout.

What must not be assumed.

  • Wind stability, acoustic performance, vehicle impact or public protection inferred from sheet appearance.
  • Foundations, ballast or anchors selected without ground and load information.
  • Street and roadside photos used as proof of a site-specific temporary-works design.

Define these decisions before comparing configurations.

The page collects the variables that change suitability, scope and price. It does not replace the approved drawing, quotation or responsible engineering review.

Purpose

State the screening, access and public-interface duty.

Defines layout and review needs.

Perimeter

Provide runs, corners, slopes and height.

Sets panels and posts.

Wind

State exposure, design wind and duration.

Controls stability review.

Ground

Describe soil, slab, pavement and anchor restrictions.

Defines feet or foundations.

Bracing

Confirm available rear space and obstructions.

Braces require a clear footprint.

Access

Schedule vehicle and pedestrian openings.

Keeps gates in the initial scope.

Configurable specification sheet.

Values shown here describe the supply variables. Exact dimensions, finishes and components are confirmed for the project.

Send the missing inputs →
FieldCurrent supply basisWhat to confirm
PanelCorrugated steel sheet in framed moduleConfirm profile, sheet and size.
PostsGalvanized steel supportsConfirm spacing and height.
BracingRear braces by approved layoutProvide footprint and loads.
BaseFeet, anchors or project-defined foundationConfirm ground conditions.
FinishCoated panel colour or printed face by scopeApprove colour and graphics separately.
AccessMatching gates by scheduleProvide clear openings.
Final basisApproved temporary layout and quotationNo wind rating is implied by imagery.

From requirement to approved supply.

The sequence keeps product selection, engineering responsibility and commercial scope aligned.

  1. 01

    Define the duty

    State what the system must separate, screen, protect or control and provide the applicable project criteria.

  2. 02

    Confirm the layout

    Provide dimensions, levels, corners, openings, supports and every site interface.

  3. 03

    Review the configuration

    Approve materials, finish, connections, accessories and the engineering or installation responsibility boundary.

  4. 04

    Release supply

    Confirm drawings, quantities, packing, destination, documentation and required delivery date.

See the system in context.

Each image explains a form, interface or possible application. Captions state where a drawing, sample or project review is still required.

Green corrugated steel temporary hoarding along a generic street edge
Street-edge screeningProduct-family context; wind, ground, public interface and temporary-works approval remain project-specific.
Corrugated steel panel post, base and brace
Rear-braced supportIllustrative connection; anchors, ballast and loads require review.
Green hoarding along a sloped works boundary
Sloped perimeterExisting context only; alignment and stability require a project layout.

Questions to resolve before purchase.

These answers define the quotation boundary without inventing project-specific performance.

How is wind stability determined?

Provide screen height, exposure, design wind, duration, ground and brace geometry for responsible review.

Can graphics be printed on the panels?

Colour or graphics can be reviewed separately from the structural and temporary-works scope.

Are gates available?

They can be coordinated when clear openings, traffic, travel, hardware and support are defined.

Are the street images completed projects?

They are product-family context and do not prove site ownership or design performance.

Complete the project brief

Keep this product inside the temporary-system decision path.

Confirm duty, layout, public interface, ground, exposure, support, gates, duration, inspection, packing and the responsible approval boundary.

Send a quote-ready brief.

Complete the known fields. If drawings or standards apply, mention them in project notes and attach them when your email application opens.

Submitting this local form opens your email application. It does not transmit data to the website.

Review the generated email before sending.