This page decides
Which site interfaces, dimensions and responsibility fields must accompany the product enquiry.
Interface guide · responsibility map
Turn the site condition into a controlled supplier handoff while preserving structural, civil, access and approval ownership.
Page responsibility
Use this guide for the stated decision, then move the result into the next project step.
Which site interfaces, dimensions and responsibility fields must accompany the product enquiry.
Post spacing, member sizes, base-plate geometry, anchors, embedment, wall adequacy, drainage, loads, foundations or structural approval.
Issue controlled site information to the responsible designer, then require the supplier to return an interface drawing with assumptions and exclusions.
Direct answer
A railing elevation without its substrate, level changes and openings is not a complete enquiry.
Show every run, corner, end, change of level, opening and adjoining material. Mark whether posts are embedded, base-plated or mounted to a wall or other structure, but leave dimensions and anchors to the approved project design. Gates need their own clear openings, movement, hardware, posts and controls. Civil works, waterproofing, drainage, services and installation tolerances must be assigned rather than hidden behind “by others”.
Interface register
The table organizes information; it does not design the connection.
| Interface | Show on the buyer drawing | Supplier coordination | Responsible approval |
|---|---|---|---|
| Embedded post | Levels, substrate/ground description, prohibited zones, drainage and finishes. | Post location, offered end condition and installation/packing boundary. | Embedment, foundation, loads, reinforcement, services and construction release. |
| Base plate | Supporting material, edge distances available, levels, waterproofing and access. | Offered post/base interface and required clearances for review. | Plate, weld, anchors, substrate capacity, edge effects and sealing. |
| Wall top / side mount | Wall construction, coping, waterproofing, joints, levels and obstructions. | Proposed bracket/interface geometry for review. | Existing/new wall adequacy, reinforcement, anchors, drainage and waterproofing. |
| Gate opening | Clear width/height, movement, approach, slope, traffic, locks and controls. | Gate frame/infill, hinge/latch posts, hardware and transition panels. | Access, egress, automation, safety, foundations, controls and final acceptance. |
Drawing trail
Each revision should preserve what changed and who approved it.
Use a controlled plan and elevations with levels, materials, edges, joints, services and openings.
Name owners for design criteria, supporting construction, anchors, gates, coatings, installation and approval.
Review supplier modules, posts, transitions and components against the project information.
Freeze dimensions, samples, interfaces, deviations and document status before manufacture.
Escalation triggers
Route these questions to the responsible project professionals.
The governing guard/barrier criteria and responsible designer must be identified before product configuration.
Do not assume capacity, reinforcement, edge distance, waterproofing or anchor suitability from a photograph.
Coordinate clear openings, egress, accessibility, automation, hardware, safety and operating responsibility.
Issue the levels and approved geometry; do not let installers improvise gaps, steps or special bays.
Review contact, drainage, sealing, isolation and finish repair at interfaces.
Record an open item and hold release until the responsible party is named.
Next decisions
The RFQ and submittal guide owns the next handoff.