This page decides
Whether an enquiry contains enough controlled duty, geometry, finish, interface, approval and logistics information for supplier review.
Procurement guide · controlled handoff
Normalize supplier enquiries and submittals around one approved project basis without inventing technical values.
Page responsibility
Use this guide for the stated decision, then move the result into the next project step.
Whether an enquiry contains enough controlled duty, geometry, finish, interface, approval and logistics information for supplier review.
Product suitability, engineering design, price, lead time, packing values, conformity, acceptance or manufacture release.
Compare supplier returns against the same revision, then issue a documented approval or deviation response.
Direct answer
A product name and total length are not enough to compare offers.
Send the duty classification, controlled plan/elevations, gate schedule, site interfaces, finish brief, required evidence, quantity, destination and programme together. Ask each supplier to return the exact offered system, drawing list, sample plan, evidence map, deviations, exclusions, packing proposal and responsibilities. Manufacture should be released only against the buyer-approved revision and recorded approval status.
RFQ register
Unknown values remain visible and assigned; they are not filled with catalogue assumptions.
| Package | Buyer issues | Supplier returns | Release gate |
|---|---|---|---|
| Duty and criteria | Element role, location, governing documents, responsible designer and approval path. | Suitability assumptions, offered scope, exclusions and evidence gaps. | Duty and criteria accepted by the responsible party. |
| Geometry and interfaces | Plans, elevations, levels, openings, substrates, adjoining work and gate schedule. | Coordinated modules, posts, transitions, components and interface drawings. | Drawing revision approved with no hidden site assumptions. |
| Finish and samples | Substrate/process brief, exposure, colour/texture intent, sample and evidence requirements. | Exact offered sequence, controlled sample, records, limitations and repair method. | Sample status and production-match boundary recorded. |
| Delivery | Quantity, phase, destination, unloading/storage limits, marking and document language. | Pack IDs, contents, verified dimensions/mass when available, protection, spares and delivery basis. | Packing data and logistics responsibilities approved. |
Approval trail
Each stage needs an owner, revision and disposition.
Buyer records the document list, revision, open items and response format.
Exact offer, assumptions, deviations, evidence and missing confirmations are logged.
Approved, approved as noted, revise/resubmit or rejected status is recorded by the authorized reviewer.
The controlling revision, approved scope, packing basis and unresolved exclusions are explicit.
Attachment checklist
The private RFQ tool records filenames and status; files are sent separately.
Run IDs, levels, corners, ends, openings, slopes, wall/edge conditions and revision status.
Owner requirements, applicable clauses, responsible designer inputs and approval route.
IDs, clear openings, type, movement, hardware, posts, controls and interface responsibility.
Substrate, sequence, exposure, colour/texture, sample, inspection, repair and evidence requirements.
Required drawings, data, reports, certificates/declarations, samples, language and due dates.
Quantity, phases, destination, packing/marking, handling, unloading, storage and document requirements.
Bid comparison
A lower total is not comparable when components, evidence or responsibilities differ.
Panels or rails, posts, gates, connections, accessories, touch-up/repair materials, spares and marking.
Separate documents supplied with the bid, promised after order and unavailable for the offered configuration.
Record currency, quantity, delivery basis, validity, tax/duty boundary, payment terms and programme assumptions.
Name who must resolve design criteria, site interfaces, finish sample, evidence, packing data and final release.
Next decisions
The tool keeps blank fields marked ‘TO BE ADVISED’ and performs no engineering calculation.