Issue one controlled schedule so every bidder prices the same fence line, components, openings, documentation and responsibility boundary.

What this guide decides.

This page decidesWhich fields make an enquiry comparable and which returned documents must be checked before supply release.

This page does not decideProject engineering, local-code approval, installation method approval or supplier compliance without applicable evidence.

Representative complete dark green chain-link fence bay with posts, top rail and lower support
Representative complete-system view. The approved drawing and quotation remain the final supply basis.

Start with a marked fence-line plan.

Give every run, corner, end, slope, gate and special interface an identifier. Record dimensions and levels from the available survey, and mark unknowns as open items. Total perimeter length alone cannot define terminals, gates, special fittings or packing.

Schedule fabric and framework separately.

The fabric schedule records mesh, core wire, finished wire where relevant, coating, colour, height, roll length and selvage. The framework schedule records line/terminal/gate posts, rails, braces, tension components, fittings, finish and proposed base/interface route.

Use a dedicated gate schedule.

For each opening, state clear width/height, movement, handing, operation, duty, locks, control concept and adjacent conditions. Ask the supplier to return frame, infill, posts, hinges, latches, accessories, operator interfaces and exclusions.

Control evidence and deviations.

Name the required standard, edition, document or inspection need and the claim it supports. The submittal must map each returned document to the exact offered product and list every deviation; a generic certificate folder is not an approval record.

Keep logistics and release conditions visible.

Record quantities, phased releases, pack size/marks, corrosion and weather protection, loading basis, destination, unloading constraints, spares, drawing language and approval milestones. Release fabrication only after the applicable fields and open responsibilities are accepted.

Use one three-column approval schedule.

Use the table to expose the next decision. It is not a performance rating or a substitute for project review.

TopicFence line
Enquiry statesRun IDs, lengths, height, levels, corners, ends and interfaces.
Supplier returnsLayout basis, bay/roll assumptions, terminals, quantities and open geometry.
TopicFabric
Enquiry statesMesh, wire basis, coating, colour, dimensions, selvage and standard.
Supplier returnsExact offered values, tolerances, datasheet, labels and deviations.
TopicFramework
Enquiry statesRequired posts, supports, braces, fittings, bases and finish.
Supplier returnsComponent schedule, sections, connections, drawing and exclusions.
TopicGates
Enquiry statesOpening schedule, movement, hardware, controls and responsibility.
Supplier returnsGate system, posts, accessories, interfaces and safety boundary.
TopicDocuments/logistics
Enquiry statesEvidence, drawings, inspection, packing, destination and release stages.
Supplier returnsDocument register, pack plan, timing, deviations and approval status.

Move from enquiry to approved supply.

Keep each output in the same revision-controlled project record.

  1. 01

    Issue the controlled brief

    Send the plan, schedules, project criteria, scope and open-item register.

  2. 02

    Normalize the offer

    Return exact products, components, quantities, evidence, assumptions and exclusions.

  3. 03

    Review the submittal

    Cross-check drawing, schedule, datasheet, gate, finish, packing and deviations.

  4. 04

    Release by revision

    Record the approved basis and keep unresolved design or site decisions open.

Project-input schedule.

Carry these fields into the enquiry and return unknowns as open items instead of filling them with generic values.

ProjectSite, application, drawing references, revision, programme and destination.
FenceRuns, levels, fabric, framework, bottom, finish and quantities.
OpeningsGate IDs, clear openings, operation, locks, controls and interfaces.
EvidenceStandards/edition, drawings, samples, inspection, certificates and deviations.
SupplyInclusions, exclusions, spares, packing, freight, unloading and approval stages.

What a usable supplier response should return.

A useful response does more than repeat the enquiry. It identifies the exact proposed product and component basis, uses the same units and location IDs as the buyer's schedule, and distinguishes confirmed values from assumptions. Where a field depends on a survey, responsible design input, local requirement or another trade, it should remain visibly open rather than being converted into a silent typical value.

The commercial offer should also state what is included, optional and excluded; which drawing or datasheet revision controls the answer; what evidence maps to the offered configuration; and what must be approved before fabrication. This lets buyers compare like with like and prevents a quotation from accidentally closing a structural, safety, civil or compliance decision.

Confirmed basisExact offered products, components, quantities, finish, documents and drawing revision.
Open itemsMissing survey, project criteria, interface decisions, evidence or approvals with a named owner.
Release boundaryConditions that must be accepted before manufacture, packing, shipment or site installation.

Printable Chain Link project-input sheet.

Use one row per fence type or opening. Mark missing decisions as open and name the person responsible for closing them.

Fence-line basisLocation ID, run length, height profile, corners, ends, levels, ground conditions and interfaces.
System scheduleFabric, framework, gates, bottom condition, finish, accessories and spares.
Evidence & approvalRequired standards, submittals, samples, inspection evidence, drawing revision and approver.
Commercial scopeQuantities, inclusions, exclusions, packing, destination, delivery sequence and release conditions.

Questions to close before quotation or release.

  • Are all bidders pricing the same runs and openings?
  • Is core wire distinguished from finished coated wire?
  • Does the framework schedule include terminals and fittings?
  • Are foundations, installation and controls assigned?
  • Does each evidence file map to the offered product?
  • Which revision authorizes fabrication and packing?

Technical reference boundary.

These sources define terms and decision scope. They do not certify a XIEHENG product or approve a project.

Keep adjacent intent with its owner.

Use the site RFQ tool to carry the controlled project inputs into an enquiry without hiding unknowns.

Open the RFQ builder →

Continue with the next controlled input.

Carry the decisions from this guide into the same fence-line schedule. Keep survey, design, evidence and approval items visibly open until the responsible party closes them.

Open the RFQ builder