Planning calculator · user-entered dimensions

Fence Material & BOM Calculator

Create a transparent preliminary material count before sending the layout for product-specific review.

Calculator

Estimate a first bill of materials.

Enter project geometry and the panel width stated in your drawing or candidate product data.

Method

Transparent counting rules.

This calculator does not choose a product or manufacture a cutting plan.

net length = total length − clear gate widthpanels = ceil((net length ÷ panel width) × (1 + allowance))intermediate posts = max(panels − straight runs, 0)

How to use the result

A direct answer, plus the limits that travel with it.

Use the result as a planning input, preserve the original assumptions, and ask the supplier to confirm product-specific values.

A preliminary fence BOM converts measured run length, clear gate width and a nominated panel width into a nominal panel and post-position count. It is a budgeting quantity, not a cutting list.

When to use it

Early budgeting, supplier comparison and checking whether a hand sketch contains enough geometry for an RFQ.

Inputs that matter

Total measured length, clear gate width, panel module, separate runs, corners, gate posts and any deliberate allowance.

Worked example

For 35 m total length, a 2 m gate and 2.5 m panels, the net fenced length is 33 m and the nominal count is 14 panels before product-specific adjustment.

Common mistake

Counting the gate opening as fenced length, or assuming every corner, gate and partial panel uses the same post arrangement.