Solution planning guide

Robot Cell & Machine Guarding

Separate people from automated equipment while planning visibility, access and maintenance.

Selection sequence

Define the risk before choosing the mesh.

The product family follows the hazard, access and environment — not the other way around.

01

Machine layout and hazard zone

02

Required safety distance and guard height

03

Door count, opening direction and interlock concept

04

Visibility, reach-through and maintenance access

Engineering handoff

Information requested from the technical department.

These fields remain explicitly unverified until a responsible engineer supplies project evidence.

Technical confirmation required

Confirm supported panel sizes, posts and base options; connection and anchoring details; gate hardware; finish system; packing configuration; tolerances; test records; and the exact standards named in any quotation.